Recollecting MTC's most memorable achievements.
12
Years of Engineering the Nation
100%
Malaysian
100+
Employees
3
Floaters
in Full
Development
2019
MTC Floating Solutions renamed to MTC Engineering Consultancy to suit the more varied engineering disciplines the company offers.
Incorporations of:
MTC OREC was incorporated to delve into its first biogas project at Sedenak with a 15-year Gas Sales Agreement with Gas Malaysia Berhad.
Proposed unique solutions for Fast Interceptor Crafts and rocket motors. MTC also co-owned a High Energy Material Research Lab with UiTM - MTC HEMREL. This is intended for the development for rocket propulsion in Malaysia.
CALM Buoy System
Fabricating a PLEM at 30m water-depth at near-shore Port Dickson
2018
2017
LEDANG
The company’s second FPSO launched - MTC Ledang, which executed the fastest recorded FPSO conversion to first oil of an unprecedented 6 months.
2016
MTC Group received its first ISO, which was awarded to MTC Floating Solutions.
The Civil & Structural department has been awarded for the design, building and completion of an ice factory in Tok Bali, Kelantan that will supply local fishermen with vital resources for the improvement  of their local industry.
2015
MTC Floating Solutions incorporated to suit all engineering consultancy services.
In line with its close relationship with academia, MTC worked with Universiti  Malaysia Terengganu for a Wave Generator concept that produces sustainable energy  for the grid.

This move was MTC’s first endeavor into renewable energy and an exploration of its engineering range.
2014
Humming Bird
Offshore Solutions
MTC’s first Intellectual Property, the trademark ‘Humming Bird Offshore Solutions’ patented.

A fit-for-purpose, relocatable platform that is able to deploy to 3 fields in the span of 5 years. MTC is the first operator that relocates the same FPSO at 3 different fields twice.
2013
Nautica Muar
Redeployed from KMSE field to Anjung Kecil field

MTC operations were proven to be incredibly cost-effective & achieved  the lowest unit production cost of the whole of Carigali Malaysia.
2012
FPSO Nautica Muar deployed to Kayu Manis South East field.
In-house
Operation & Maintenance Team
A precursor for MTC to show its aptitude as a comprehensive solutions provider, from EPCIC, to floater chartering, to O&M and also T&I.
2011
Recognized by PETRONAS
Carigali for our pilot project.
Awarded the turnkey EPCIC for its upcoming leasing of the company’s first FPSO - FPSO Nautica Muar.
2010
Provided engineering consultancy on all marine disciplines as well as a dedicated Project Management Team